MOQ’s and delivery times

On this page you have the possibility to see our production times for your product.

The times given correspond to approximate production times and assume that you provide us with the raw materials. Capsules in different sizes and production aids can be provided by us and are always available.

Complete products with raw material purchase via BioPharmatec require individual planning.

The production times are calculated from the receipt of the goods and approval by our quality management.
Please always make sure that you provide us with all necessary certificates and analysis protocols in good time.
This is the only way we can guarantee a smooth process.

MonoCaps

This is the only way we can guarantee a smooth process.

GreenCaps 2in1

Tablets

GreenCaps 3in1

Bilayer Tablets

Please select a packaging option

Is a folding box required?

In principle, our terms and conditions apply to an order.

Bulk

Pots

Pouches

Blisterpack

Yes
No

Delivery time: Appr. 4 weeks
Minimum order quantity: 50,000 tablets/capsules

Delivery time: Appr. 4 weeks
Minimum order quantity: 100,000 tablets/capsules

Delivery time: Appr. 4 weeks
Minimum order quantity: 2 times 100 kg powder mixture

Delivery time: Appr. 6 – 8 Weeks
Minimum order quantity: 50,000 tablets/capsules

Delivery time: Appr. 6 – 8 Weeks
Minimum order quantity: 100,000 tablets/capsules

Delivery time: Appr. 6 – 8 Weeks
Minimum order quantity: 2 times 100 kg powder mixture